How to Use the Step Guides
02.
 
Understanding Your Reasons for Building
03.
 
Site Analysis and Pre-Design Assessment in New Home Construction
04.
 
Researching the Building Process
05.
 
Using the Simpli Portal for Building Consent and Compliance

06.
 
Setting a Preliminary Budget
07.
 
Choosing the Best Hardware Store for Your New Build
08.
 
Land Ownership Types in New Zealand
09.
 
Maximising Cash Flow in Construction
10.
 
Cost Components of a New Build
11.
 
Land Terrain Types and Their Influence on Building
12.
 
Environmental Impact Assessment in New Home Construction
13.
 
Matching Property Types to Your Land Choice
14.
 
Deciding on the Type of House to Suit Your Land and Project
15.
 
Architectural Considerations and Planning Permissions
16.
 
Choosing the Right Builder
17.
 
Assembling the Right Team
18.
 
New Build Project Management Tools
19.
 
Building Contract Guide for Clients
20.
 
Due Diligence and Contracts in Building Projects
21.
 
Change Order Management in Construction Projects
22.
 
Financing Strategies for New Build Homes
23.
 
Progressing Planning and Designing
24.
 
Design Principles for Your New Home Build
25.
 
On-grid vs. Off-grid Living
26.
 
Foundation Types for New Zealand New Builds
27.
 
External Cladding Options for New Zealand Homes
28.
 
Interior Cladding Options for New Zealand Homes
29.
 
Flooring Options for New Zealand Homes
30.
 
Utility Connection Planning
31.
 
Finalising Your New Build Construction Plans
32.
 
Key Consents for New Build Projects
33.
 
Finalising Detailed Architectural Plans and Building Specifications
34.
 
Recheck and Reforecast Your Build Costs
35.
 
Regular Financial Audits
36.
 
Keeping a Debits and Credits Log for Construction Expenses
37.
 
Construction Phase Contingency Planning
38.
 
Effective Risk Management Strategies in Construction Projects
39.
 
Breaking Ground on The New Build
40.
 
Essential Construction Material Order Timings for New Builds
41.
 
Site Visits for Building Inspections and Material Delivery
42.
 
Understanding Milestone Payments in Construction Projects
43.
 
Laying Foundations and Frameworks
44.
 
Security and Site Management During Construction
45.
 
Installing Roof Stage
46.
 
Quality Control Checks During Construction
47.
 
Installing Windows and Doors Stage
48.
 
Preparation and Treatment of Exterior Cladding Materials
49.
 
Installing Exterior Cladding
50.
 
Completing Electrical Pre-Wire
51.
 
Completing Plumbing Pre-installation
52.
 
Completing Insulation Installation
53.
 
Preparation and Treatment of Interior Cladding Materials
54.
 
Installing Interior Cladding
55.
 
Post Installation Interior Wall Preparation and Treatment
56.
 
Post Interior Cladding Installation Cleaning
57.
 
Installation of Flooring in New Home Construction
58.
 
Installation of Kitchen in New Home Construction
59.
 
Installation of Bathroom and Toilet in New Home Construction
60.
 
Installing Fixtures and Fittings in New Home Construction
61.
 
Final Electrical Fit Out in New Home Construction
62.
 
Final Plumbing and Gas Fit Out in New Home Construction
63.
 
Installation of a Deck in New Home Construction
64.
 
Final Cleaning and Detailing
65.
 
Installation of Window Treatments in New Home Construction
66.
 
Final Inspection and Certifications for New Home Construction
67.
 
Practical Completion and Handover to Homeowner in New Home Construction
68.
 
Post-Construction Reviews
69.
 
Financial Planning for Long-Term Property Maintenance
70.
 
Post-Construction Warranty and Maintenance Information
71.
 
Community and Neighbourhood Integration
72.
 
Planning for Sustainability in Your New Home
73.
 
Home Enhancement and Upgrades
74.
 
Resale Preparation and Valuation

Previous Step
Do you need help with this step?
Next Step
Do you need help with this step?
Build / Step 5 of 74

Using the Simpli Portal for Building Consent and Compliance

Using the Simpli Portal for Building Consent and Compliance

The Simpli Portal (https://simpli.govt.nz/home) is a crucial tool for streamlining the building consent process in new home construction, offering a unified platform for both homeowners and professionals to manage documentation and compliance efficiently.

[Image Credit Attribution: https://simpli.govt.nz/home]

Key Activities:
Considerations:

Using the Simpli Portal effectively can significantly enhance the efficiency of the building consent process, making it easier for homeowners and professionals to navigate the regulatory environment and ensuring all compliance aspects are handled smoothly.

Key Simpli Website Links:  

Login Link:                     

https://simpli.govt.nz/login

Forms:                         

https://simpli.govt.nz/forms

How to Apply:                

https://simpli.govt.nz/how-to-apply

Required Documents:   

https://simpli.govt.nz/required-documents

Support:                        

https://simpli.govt.nz/support

simpli portal building consent, using simpli for construction, building consent online application, tracking building consent, simpli portal documentation, building regulatory compliance, simpli user guide, building consent process, simpli portal benefits, construction project management, building consent communication, building consent efficiency, online building applications, building consent security, simpli portal support, new home construction consent, building compliance online, simpli portal navigation, construction documentation management, simpli account setup, building standards compliance, simpli real-time updates, building consent status tracking, simpli portal training

 

Previous Step
Do you need help with this step?
Next Step
Do you need help with this step?